Eastern Iceland was built during 2003-2009 one of the largest projects of its kind in Europe for the construction of a dam system and power station A 690-megawatt hydroelectric power plant for an aluminum smelter built in the East Coast. The dam reaches a height of 190 meters and a length of over 700 meters (the highest in Europe). The power station built in the depths of the mountain includes six turbines and halls of machine rooms. Epolac has supplied two epoxy floor systems to the project 

 TOPP 4000 system – decorative flooring system

With great mechanical strength and good resistance to exposure to a variety of chemicals, Easy to clean and maintain based on transparent, solvent-free transparent epoxy resins (100% solids content) and inert quartz colored aggregates. The system is implemented in a thickness of 3 mm and was performed on the floor of the turbine rooms with a total area of ​​about 3,000 square meters

 The second system included a thick coating of 10-31 SL-HB 

Machinery rooms and technical rooms with a total area of ​​over To 6,000 square meters and an average thickness of 500 microns (100% solids content), hard coating with excellent resistance to chemical exposure and wear. The system can be applied on a concrete or steel infrastructure and preserves its properties over time even in extremely harsh environmental conditions.